Thursday, November 5, 2009

The Bathroom Project Part 4 - Plumbing



This was intermediate plumbing, at least for me that's why Jose helped me out on this one. The new shower panel I bought from eBay needs to be connected to the hot and cold water valve only so Jose did his magic and rerouted the piping as shown in the picture. He also installed the new tub drain, created a new power line for the tub and assembled the fixture in our new vanity. Together we secured the tub to the frame.

No comments:

Post a Comment