skip to main
|
skip to sidebar
Wednesday, November 4, 2009
The Kitchen Project Part 1
This is the pre-renovation appearance. The flooring used to be dark green with gold lining. I replaced it with vinyl temporarily.
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Modern Minimalist
Followers
Blog Archive
►
2012
(1)
►
August
(1)
►
2011
(7)
►
July
(1)
►
February
(6)
▼
2009
(26)
▼
November
(26)
The Second Generation Look
The Bathroom Project Part 7 - The Finished Product
The Bathroom Project Part 6 - The Final Touch Up
The Bathroom Project Part 5 - Tiling
The Bathroom Project Part 4 - Plumbing
The Bathroom Project Part 3 - Installing Wonderboa...
The Bathroom Project Part 2 - Demolition
The Master Bathroom Project Part 1 - Introduction
Some Minor Upgrades - Master Bedroom Door
The Guest Bathroom
Some Minor Upgrades - Walk-In Closet
Some Minor Upgrades - Hanging The Plasma
Some Minor Upgrades - Shelves On Laundry Room, Cup...
Some Minor Upgrades - Sliding Door
Some Minor Upgrades - Front Door
The Kitchen Project Part 6 - The Finished Product
The Kitchen Project Part 5 - Cabinets And Fixtures
The Kitchen Project Part 4 - Floor Slating
The Kitchen Project Part 3 - Painting
The Kitchen Project Part 2 - The Demolition
The Kitchen Project Part 1
The First Generation Look!
Changing The Color Of The Railing
Hardwood Floors
Painting The House!
Moving In!
About Me
NOISEBOX
A music enthusiast.
View my complete profile
No comments:
Post a Comment